2013 Bombardier Challenger 605

Price: Make Offer

  • Serial Number: 605-5925
  • Tail Number: N68UW
  • Hours: 3,108
  • Cycles: 1,682
One USA Part 91 Owner Since New
Privately Hangared (KMKE) with full time Crew/MX Technician
Pristine records dating back to birth
Heavy Maintenance complied with at Duncan
Engines Enrolled on GE On-Point Program
APU Enrolled on MSP
CAMP Maintenance Tracking
No Known Damage History

Airframe

Total Hours:
3,108
Total Cycles:
1,682
Home Base:
MKE
Maintenance Tracking:
CAMP

Engines

GE, CF34-3B
Engine Program Coverage:
GE OnPoint

Engine 1

Serial Number:
801676
Hours Since New:
459
Cycles Since New:
253

Engine 2

Serial Number:
801202
Hours Since New:
3,108
Cycles Since New:
1,706

APU

Description:
Honeywell CTCP 36-150(CL)
APU Program Coverage:
MSP
Serial Number:
P-374
Total Time Since New:
3,166

Avionics

Maintenance Program:
SMART PARTS
Collins ProLine 21 Advanced System Includes:
Four AFD 5022 Adaptive Flight Displays
Dual ADC-850E Air Data Computers
Triple Honeywell IRU Laser Ref V
Dual DCU 4002 Data Concentration Units
Engine Instrument/Crew Alerting System (EICAS)
Upgraded Collins Multi Scan Radar
Triple FMC-6000 Flight Management System w/WAAS LPV
Dual GPS-400S GPS
Dual NAV-4000 Nav Units w/FM Immunity
Dual VHF-4000 Comm System w/8.33 KHz spacing
Third VHF-4000 Comm
Dual DME-4000 DME
Collins TTR-4000 TCAS II w/Change 7.1
Dual Collins TDR-94D Mode S ATC Transponders w/ADS-B Out
Dual Collins ALT-4000 Radio Altimeter
Dual HF-9031A HF w/SELCAL
Honeywell Mark V EGPWS w/RAAS
L3 Communications 120 Minute Cockpit Voice Recorder
L3 Communication Flight Data Recorder
Datalink w/Link 2000+ and Iridium Interface
Lightning Detection System

Inspections

6 Month Inspection
Performed: June 2025
Next Due: November 2025
12 Month Inspection
Performed: June 2025
Next Due: May 2026
24 Month Inspection
Performed: June 2025
Next Due: May 2027
36 Month Inspection
Performed: June 2025
Next Due: June 2029
48 Month Inspection
Performed: June 2025
Next Due: June 2029
96 Month Inspection
Performed: July 2021
Next Due: June 2029
192 Month Inspection
Next Due: June 2029
400 Hour Inspection
Performed: 3,099 Hours
Next Due: 3,499 Hours
600 Hour Inspection
Performed: 2,943 Hours
Next Due: 3,543 Hours
800 Hour Inspection
Performed: 2,754 Hours
Next Due: 3,554 Hours
1200 Hour Inspection
Performed: 2,373 Hours
Next Due: 3,573 Hours
1600 Hour Inspection
Performed: 3,099 Hours
Next Due: 6,299 Hours
2400 Hour Inspection
Performed: 2,260 Hours
Next Due: 4,660 Hours
3200 Hour Inspection
Performed: 3,099 Hours
Next Due: 6,299 Hours
4800 Hour Inspection
Next Due: 4,800 Hours
6400 Hour Inspection - Due @ 6400 Hours Landing Gear Overhaul - Next Due June 2029

Additional Equipment/Features

RVSM, MNPS, RNP5/10 Capable
Electronic Flight Bag
HUD/EVS
EVAS
Full-face Crew EROS Oxygen Masks
Artex C406-N MHz ELT
Datalink Printing w/Network Printer
Swift Broadband Cabin Connectivity WLAN
Dual Blu-Ray/DVD/CD Player
Airshow ASXI
Forward and Aft Cabin22” HD Video Monitors
Aircell ST400 Iridium Satcom w/2 Handsets
Coffeemaker
Espresso Maker

Interior

Interior Last Refurbished:
2013
Bombardier Completion Center, Montreal, Quebec, June 2013. Fireblocked, Floorplan 1, Ten (10) place executive interior configuration. Four (4) place club seating forward and a 2-place fwd and aft facing seating arrangement with Table and a full-berthing three (3) place , four (4) belted divan. Jump seat is for crew use only. Forward galley and aft small lavatory. The headliner and sidewalls are Rice Ultraleather. Dado panels are Grappa leather. The seats are covered in Pal Mushroom Classic Cowhide leather. The divan is covered in beige fabric. The carpet is light and medium beige. The woodwork is Recon Cherry high gloss veneer. Plating is Satin Almond Gold.

Exterior

Base Paint Colors:
White
Stripe Colors:
Red, Silver and Black
Last Painted:
2016